Projects

Select Projects

Khadki Railway station Foot Over Bridge

Name of work

Construction of foot over bridge at Khadki Railway station, Pune

Technical Information

Foot over bridge constructed at Khadki Railway station in structural steel

1) Length – 95.50 r/mtr.

2) Width – 3.60 r/mtr. + 2.60 +2.20 mtr.

3) Roofing of poly carbonate sheet.

4)Staircase 3 nos.

5) Total weight of steel – 102.17 tan.

Need

Residence of Aundh & Range hills are crossing railway track for going to Pune-Bombay road. Shools, colleges & hospitals are located at Pune –Bombay rd. for that pedestrians are crossing the railway track dangerously. So that local MLA’s, elected representatives are demanding to construct the foot over bridge on railway track. So PMC has proposed FOB, which falls in railway & Cant. Area. The construction cost of FOB is 169.98 lacs & now FOB is opened for pedestrians.

Outcome

FOB is useful for pedestrians & no mishap & accidents will be occurred.

khadki Railway station fob khadki Railway station fob khadki Railway station fob